Friday, October 22, 2010

The contractor has paved the final lift of hot-mix asphalt (surface course) this week on Meadowlark and Terrace.

The contractor has completed work on curb and gutter, driveway and sidewalk replacement this week on Michael. The contractor is scheduled to grind the existing asphalt pavement late this week and prepare for hot-mix asphalt paving into next week on Michael.

Friday, October 15, 2010

The contractor is scheduled to pave the final lift of hot-mix asphalt (surface course) next week on Meadowlark and Terrace.

Utility (water main) work has been completed on Michael Lane. The contractor is scheduled to work on curb and gutter, driveway and sidewalk replacement next week on Michael. Residents will need to park on the street for 4 or 5 days while the concrete curb and gutter cures in front of their driveways. The contractor will notify residents that need to have their vehicles moved out of their driveways prior to concrete work.

Friday, October 8, 2010

The contractor will continue with utility structure adjustments on Meadowlark and Terrace into next week. The contractor is scheduled to pave the final lift (hot-mix asphalt surface course) on Meadowlark and Terrace in mid-October.

Utility (water main) work will be completed on Michael Lane this week. The contractor is scheduled to proceed with curb and gutter replacement and asphalt grinding later this month.

Friday, October 1, 2010

The contractor will continue with utility structure adjustments on Meadowlark and Terrace into next. The contractor is scheduled to pave the final lift (hot-mix asphalt surface course) on Meadowlark and Terrace in mid-October.

The contractor is scheduled to continue installing water services on Michael Lane into next week (weather permitting). Each resident will be notified on the day of the work when the water will need to be shut down for a short amount of time.